
Climate Control Units & Process Cooling Systems
DGPCC offer a comprehensive fleet of climate control units and process cooling equipment to keep your business operations on the move. We offer a range of capital equipment to cover for emergencies, seasonal or NPD business spikes, or cover for planned maintenance of cooling of space or processes (standalone or supplementary systems).
Here is just some of the climate control units and process cooling equipment we have to offer:
Air Cooled Chillers from 10kw – 750kw or multiples thereof (fully packaged or bare units)
Heat Pumps from 20kw – 300kw
Low temperature air handling units (20 – 50kw or multiples)
Air Handlers for HVAC applications (50kw – 300kw or multiples)
Fan Coils (20, 30 & 50kw or multiples)
Spilt system room conditioning units (7.5kw)
Heat exchangers
Additional buffer tanks
Additional pump sets
Hoses and Fittings
Ducting and air distribution systems
Power Generation and fuel management support services
Our Customers Say…
”I like trust, transparency, good prices and partnership”
– Danny Roberts, Logistics Manager, National Veterinary Service
“You gave us the best option for what we wanted, it was the most complete unit,
– Ricky Rowett, AMRC Composites Centre
“Dawsongroup provided a unique customer support service for our requirements”
– Peter Greer, AstraZeneca
See Who We Have Helped
Case Study: Pharmaceutical
A major Pharmaceutical outsourcing company was experiencing ongoing issues with a critical part of their cooling plant, the unit in …Case Study: Healthcare
Our Customer had an issue with a chilled water circuit feeding critical scanning equipment.Case Study: Data Centres
A long-standing facilities manager partner approached us on behalf of a client they supported in Central London.Case Study: Manufacturing
The customer manufactures a wide range of plastic storage containers for various applications.Case Study: Bakery
We supplied/installed a suitably sized glycol (air-cooled) chiller with on board pumps /tank along with low-temperature air handlers positioned internally.Case Study: Baked Savouries
One of our customers had concerns over staff welfare from March through to the end of September during the higher …Case Study: Dairy
Customer had experienced a major incident on site, which had resulted in the loss of some valuable storage space for …Case Study: Confectionary
The customer had major issues in their main packing area due to high ambient and humidity levels.Case Study: 3PL
Customer was currently operating mixed products in an ambient warehousing facility – they had the opportunity to take on a …Case Study: Automotive
Customer had secured a new contract which meant they needed to install various new manufacturing cells to their production area, …
Speak To An Expert